top of page
Image from iOS (3).jpg

​

Rwaza 

TYPE:                               Run-of-river Hydropower

CAPACITY:                       2.6 MW

LOCATION:                      RWANDA – Mukungwa River in Musanze District, Northern Province

STATUS:                           Operational

START OF OPERATION:     2019

TURBINE:                         2 x 1.3 MW Francis

​

PARTNERS:  DCFE

​

 

bottom of page